Yincun Town, Longyao County, Hebei Province, China

Home >> News >> Daily maintenance of steam solenoid valve

Daily maintenance of steam solenoid valve

Aug. 18, 2020

 Daily maintenance of steam solenoid valve

China Industrial Valves Suppliers shares that after the installation of the steam solenoid valve, it shall conduct media entry test for several times, and only after it is confirmed to be normal can it be put into official use.

Should be cleaned regularly inside and outside of the large valve and the suction surface of the dirt, pay attention not to damage the sealing surface.

When the steam solenoid valve is not used for a long time, the manual valve should be closed before the valve, and when it is reactivated, the steam solenoid valve should remove the condensed water, and make several test actions, until the switch is normal before it can be put into use.

When the steam solenoid valve is removed from the pipeline, it should be cleaned and stored with compressed air.

When use time is longer, if the seal between piston and valve seat is not good, can grind the piston sealing surface again, grind with valve seat again.

When working, pay attention to the pressure gauge before and after the valve, the working pressure shall not exceed the rated pressure, the working pressure must be in the rated pressure range. When the working pressure exceeds the rated pressure or the working pressure difference exceeds the rated pressure difference, the steam solenoid valve to stop using, close the manual valve before and after, to avoid the steam solenoid valve explosion and leakage.

That's all for the sharing, thanks for your reading, and we also supply High Temperature Ball Valves China  for sale, if you have any demand for our products, just feel free to contact us.